Professionals in the Cambridge area have provided information about how much architects cost(s). Here are some of the individual reports:
02139, Cambridge, Massachusetts - December 13, 2019
Commercial Architects9.13 - 9.40 percent of construction cost Fee takes into account staff hours. It also includes basic planning, drafting blueprints for new construction building, and oversight of project through completion of construction. Does not include residential design jobs, major renovations, construction materials, permits, and major revisions to the original blueprints.
Reported by: ProMatcher Research Team |
02139, Cambridge, Massachusetts - May 7, 2018
Residential Architects13.04 - 13.69 percent of construction cost Price of home architectural design is included. It also accounts for the cost of planning, drafting plans, and supervising the construction of a home according to the project blueprints. Cost excludes permitting, rush jobs, building materials, and commercial projects.
Reported by: ProMatcher Research Team |
01821, Billerica, Massachusetts - September 6, 2022
Residential Architects$85.00 to $150.00 per hour (plus materials) $3.00 to $7.00 per square foot (design cost only) 7.00 to 10.00 percent of construction cost Billings are hourly, percentage of construction cost or fixed fee.
Reported by: David Kinsella, d. a. kinsella company |
01853, Lowell, Massachusetts - December 13, 2019
Commercial Architects8.99 - 9.26 percent of construction cost Fee considers the cost of commercial architecture services. Estimate includes basic research, planning, drawing up plans (new construction, and coordination with construction team throughout the project. Does not include residential projects, remodeling jobs, making major design revisions, permitting, and building materials.
Reported by: ProMatcher Research Team |
02205, Boston, Massachusetts - December 13, 2019
Commercial Architects9.28 - 9.55 percent of construction cost Fee range includes staff hours. Estimate accounts for basic planning, drafting blueprints for new construction building, and oversight of project through completion of construction. Cost does not include residential design jobs, major renovations, construction materials, permits, and major revisions to the original blueprints.
Reported by: ProMatcher Research Team |
01702, Framingham, Massachusetts - December 13, 2019
Commercial Architects9.42 - 9.70 percent of construction cost Fee estimate includes commercial architecture services. It also includes planning, drafting original plans for a new construction project, and supervision throughout the construction process. Cost does not take into account residential projects, remodeling jobs, making major design revisions, permitting, and building materials.
Reported by: ProMatcher Research Team |
01760, Natick, Massachusetts - December 13, 2019
Commercial Architects9.42 - 9.70 percent of construction cost Manhours for commercial architecture services are included. Estimate includes planning, drafting original plans for a new construction project, and supervision throughout the construction process. However, it does not include residential projects, remodeling jobs, making major design revisions, permitting, and building materials.
Reported by: ProMatcher Research Team |
01702, Framingham, Massachusetts - May 7, 2018
Residential Architects13.45 - 14.12 percent of construction cost Price includes labor for residential architectural design services. Items included: drafting floor plans, coordinating with the general contractor, and overseeing the construction proccess. Cost does not take into account commercial projects, major design revisions, permit expediting, and overtime hours.
Reported by: ProMatcher Research Team |
01760, Natick, Massachusetts - May 7, 2018
Residential Architects13.45 - 14.12 percent of construction cost Includes labor. Cost estimate also includes drafting floor plans, coordinating with the general contractor, and overseeing the construction proccess. Excludes commercial projects, major design revisions, permit expediting, and overtime hours.
Reported by: ProMatcher Research Team |
02205, Boston, Massachusetts - May 7, 2018
Residential Architects13.25 - 13.91 percent of construction cost This is a general cost for home architectural design. Estimate takes into account planning, drafting plans, and supervising the construction of a home according to the project blueprints. Excludes permitting, rush jobs, building materials, and commercial projects.
Reported by: ProMatcher Research Team |
01853, Lowell, Massachusetts - May 7, 2018
Residential Architects12.84 - 13.48 percent of construction cost Price quote includes residential architectural design services. It includes custom design plans for an addition, remodel, or new home and construction oversight. Excludes commercial projects, major design revisions, permit expediting, and overtime hours.
Reported by: ProMatcher Research Team |
01821, Billerica, Massachusetts - May 9, 2017
Commercial Architects$55.00 to $120.00 per hour (plus materials) $2.00 to $5.00 per square foot (design cost only) 5.00 to 14.00 percent of construction cost Weekly billing for hourly, percentage of construction cost and fixed fee.
Reported by: David Kinsella, d. a. kinsella company |
01821, Billerica, Massachusetts - June 19, 2014
Commercial Architects$45.00 to $120.00 per hour (plus materials) 3.00 to 10.00 percent of construction cost Hourly method depends on staff person and discipline-will do fixed fees base on estimated hours.
SF-do not use this cost method will do fixed fees.
% method: 40% of fee for design, 30% of fee for construction drawings; base on total construction value
Reported by: David Kinsella, d.a.kinsella & company |
01821, Billerica, Massachusetts - June 19, 2014
Residential Architects$45.00 to $120.00 per hour (plus materials) 3.00 to 10.00 percent of construction cost Hourly method depends on staff person and discipline
SF-do not use this cost method will do fixed fees.
% method: 40% of fee base on total construction value for design, 30% of fee for construction drawings; base on total construction value
Reported by: David Kinsella, d.a.kinsella & company |
|
|
|
|
Cambridge Architects
d.a.kinsella & company7 Bridge Street, Suite 9, Billerica, MA 978-667-7971
|
d. a. kinsella company1A Andover Road, Billerica, MA 978-667-7971
|
Studio47 Architects 517 Boston Post Rd, Sudbury, MA 508-500-4730
|
|
|
|